PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Before pouring concrete at underground service pipes Facing South (800x600).jpg Building rebar columns for Elev. 1,2,3  (3rd Floor) Facing East (800x600).jpg Erecting the steel arch at Derrick -2 (2nd Floor) Facing North (800x600).jpg Erecting the steel arch at Derrick -2 (2nd Floor) Facing North-West (800x600).jpg Excavating for underground storm piping between column lines G-G.1 Facing South-East (800x600).jpg Finishing wiring the electrical panel Facing South (800x600).jpg Installed pour stops at Derrick -3 (2nd Floor) Facing East (800x600).jpg Pour stops at Elev. 5,6 (2nd Floor) Facing West (800x600).jpg
Previous pageNext page Erecting the steel arch at Derrick -2 (2nd Floor) Facing North-West (800x600)
Erecting the steel arch at Derrick -2 (2nd Floor) Facing North-West (800x600)